MRP Run Time Reduced from6 Hours to 8 Minutes
A mid-sized manufacturer in Dubai was running MRP manually every Friday ??? a 6-hour process that blocked production planning until Monday. We re-implemented their SAP B1 with proper BOM structures and automated the MRP run.
The Challenge
Manual MRP running 6 hours every Friday, blocking production planning.
The Solution
BOM restructure, routing configuration, automated MRP scheduling inside SAP B1.