Manufacturing

MRP Run Time Reduced from 6 Hours to 8 Minutes

A mid-sized manufacturer in Dubai was running MRP manually every Friday ??? a 6-hour process that blocked production planning until Monday. We re-implemented their SAP B1 with proper BOM structures and automated the MRP run.

97% reduction in MRP run time